QSA Certified
KavachOne is officially a PCI DSS Qualified Security Assessor (QSA) Company.  For any PCI DSS support or certification requirements, feel free to reach out:  info@kavachone.comwww.kavachone.com
KavachOne is officially a PCI DSS Qualified Security Assessor (QSA) Company.  For any PCI DSS support or certification requirements, feel free to reach out:  info@kavachone.comwww.kavachone.com
logo
GDPR Article 35 Compliant

Complete DPIA Lifecycle — Screening to Risk Closure

DPIA Suite guides your organization through the full Data Protection Impact Assessment process. Structured questionnaires, three-mode risk identification — AI, rule engine, and manual flagging — and audit-ready reports, all in one governed platform.

DPIA Suite — Dashboard
Live
DPIA Suite Dashboard
ROPA-Triggered DPIA

Your Record of Processing Activities Tells You When a DPIA Is Needed

DPIA Suite connects to your ROPA — the Article 30 register of processing activities. When a processing entry carries high inherent risk, the platform flags it and initiates a DPIA assessment automatically, ensuring no high-risk activity slips through unassessed.

High-Risk Processing Detected

Systematic profiling, large-scale sensitive data, or biometric processing in ROPA automatically triggers a DPIA requirement.

Screening Outcome Escalates Automatically

The screening questionnaire evaluates the processing activity and escalates to a full DPIA if risk thresholds are met.

Pre-Populated from ROPA Metadata

Processing purpose, data categories, recipients, and retention periods flow from ROPA into the DPIA questionnaire — no double entry.

Two-Way Linkage

The completed DPIA is linked back to the ROPA entry, keeping your Article 30 register complete and audit-ready.

ROPA — Processing RegisterLive
Processing ActivityRisk LevelDPIA Status
Customer Analytics PlatformHighRequired
Employee HR DatabaseMediumIn Progress
Marketing Email SystemLowNot Required
Biometric Access ControlHighRequired
Third-Party Data SharingMediumScreening
2 processing activities require a DPIA — assessments initiated automatically
Designed for Every Role

One Platform. Every Stakeholder Covered.

DPIA Suite is built around the real workflows of compliance teams — with distinct, purpose-fit experiences for DPOs and Department Admins.

DPOs & Compliance Admins

Initiate assessments, configure questionnaire categories, review and approve answers, identify and score risks using AI or rule-based engines, oversee mitigation progress, and generate audit-ready DPIA reports — with full lifecycle visibility at every stage.

Department Admins

Complete structured DPIA questionnaires section by section, track assessment progress, respond to flagged answers, attach supporting documentation, submit risk justifications, and coordinate mitigation actions — all within a guided, structured interface.

7-Step Process

The Complete DPIA Lifecycle

A structured, enforced workflow from initial screening through risk closure — every step governed, every transition audited.

Screening

A structured screening questionnaire evaluates the processing activity against GDPR Article 35 criteria. The system automatically determines whether a full DPIA is required or low-risk. ROPA-flagged activities bypass screening and go straight to DPIA.

DPIA Assessment

The Department Admin completes a structured, multi-category questionnaire covering data types, processing purposes, retention, third-party sharing, security measures, and more. Each question supports notes, justifications, and document uploads.

Review

The DPO reviews each questionnaire answer — approving, rejecting with remarks, or flagging for risk escalation. Rejected answers are returned for resubmission. Risk-flagged answers automatically surface in the Risk stage.

Risk

Flagged answers generate risk candidates automatically. The DPO can enrich the risk register using AI-generated suggestions or pre-configured GDPR rule engine entries. Each risk is scored on a 3×3 Likelihood × Impact matrix and categorized.

Mitigation

Risks are assigned to Department Admins with due dates and responsible persons. Admins submit mitigation plans or justifications. The DPO reviews, requests revisions, or approves. Residual risk scores are captured after treatment.

Closure

Once all risks reach an acceptable residual level, the DPO formally approves the DPIA closure. Accepted residual risks are documented with rationale. The assessment is marked complete with a full timestamped audit trail.

Report

Generate the complete DPIA Assessment Report and Risk Register Report on demand — capturing every answer, decision, risk entry, mitigation action, and closure approval. Regulator-ready from the moment it's produced.

Risk Identification

Three Modes to Surface Every Risk — Nothing Missed

DPIA Suite combines human judgment, AI analysis, and deterministic GDPR rules into a unified risk identification engine that feeds a single, governed risk register.

How It Works

From Flagged Answer to Structured Risk Entry

Every risk in DPIA Suite traces back to a source — a flagged questionnaire answer, an AI suggestion from the analyzer, or a rule engine trigger. All three modes produce structured, scoreable risk entries that land directly in the risk register as drafts for DPO review.

Flagged Question Engine

DPO marks answers as risk-flagged during review. Automatically surfaces as a risk candidate in the register — linked to its source question with full context preserved.

AI Risk Analyzer

Flagged answers are submitted to the AI engine. Returns fully-structured risk entries: title, category, likelihood, impact, description, and contingency plan — ready for one-click approval.

Rule-Based Risk Engine

Pre-built GDPR rules scan answers deterministically. Known patterns — retention violations, missing notices, cross-border gaps — auto-populate matching risk entries without manual intervention.

Manual Risk Entry

DPOs can add risks directly to the register at any time — documenting domain knowledge, expert judgment, or contextual risks that fall outside automated detection.

🤖AI Risk Analyzer — OutputDraft → Pending DPO Approval
Risk TitleCross-Border Transfer Without Adequate Safeguards
Category
Cross-Border TransferThird-Party Risk
Likelihood
High — 3
Impact
High — 3→ Critical Score: 9
Source
Q14 — Third-Party Transfers
DescriptionPersonal data is transferred to a processor in a third country without a documented adequacy decision, SCCs, or BCRs — violating GDPR Chapter V obligations.
ContingencyImplement SCCs for all third-country transfers. Conduct a Transfer Impact Assessment (TIA). Document safeguards in the processing register and schedule annual review.
📚 Rule Engine — Triggered Rules8 Rules Active
Retention Period ExceededCritical
Missing Privacy Notice (Art. 13/14)Critical
Cross-Border Transfer Without SafeguardsHigh
Consent Not DocumentedHigh
Vendor DPA Not in PlaceHigh
Data Minimisation Not AppliedMedium
Access Control Gaps IdentifiedMedium
No DPIA for High-Risk ProcessingMedium
Risk Register

A Living Risk Register — Governed from Identification to Closure

Every risk across all assessments flows into a centralized, structured register. Each entry is trackable, assignable, scoreable, and linked directly to its source — powered by AI, rule engines, and human review.

3×3
Likelihood × Impact scoring
4
Priority levels tracked
12+
GDPR risk categories
100%
Audit trail per status change

Structured Risk Entries

Every risk captures a complete record: title, description, source question, category, assigned department, responsible person, due date, mitigation strategy, and current status — all linked to the originating assessment.

CriticalHighMediumLowCategory TaggedSource Linked

Governed Lifecycle Workflow

Each risk follows a defined, enforced state machine. Department Admins submit justifications; DPOs review, request revisions, or approve closure. Every transition is timestamped — an unbroken audit chain from identification to closure.

IdentifiedAssignedSubmittedNeeds RevisionClosed

AI-Populated Entries

The AI Analyzer populates risk entries directly as drafts — pre-filled with title, category, scores, description, and contingency plan. DPOs review and approve in one click. Dramatically reduces documentation effort on complex assessments.

Auto-titledCategory DetectedScores SuggestedContingency Drafted

Rule Engine Auto-Population

Pre-built GDPR rules fire on known answer patterns and insert matching risk candidates into the register — no manual effort for standard exposures like retention violations, missing notices, or undocumented cross-border transfers.

Retention ExceededMissing Privacy NoticeCross-Border No SafeguardsConsent Not Documented

Mitigation & Residual Risk Tracking

After treatment, the register captures residual risk scores alongside original scores — showing the actual risk reduction achieved. DPOs see which risks remain elevated post-mitigation and whether the residual is within acceptable bounds.

Original Score PreservedResidual Score TrackedDelta Calculated
Why It Matters

Not a Spreadsheet. A Governed Risk System.

Unlike static documentation, every register entry is a live record — linked to its source question, scored on a 3×3 matrix, assigned through a governed workflow, and tracked until closure or documented acceptance.

Risk Register View
Risk Coverage

Coverage Across All GDPR Privacy Risk Domains

DPIA Suite's risk framework spans every major GDPR privacy risk domain — AI and rule engines are pre-configured across all categories from day one.

Data BreachUnauthorized AccessData MinimisationRetentionThird-Party RiskConsent IssuesCross-Border TransferIT & SecurityVendor DependencyCompliance GapsAccess ControlNetwork Security
Enterprise Reporting

Audit-Ready Reports on Every Assessment & Risk

Generate comprehensive, structured reports on demand — covering the full assessment history, risk register findings, mitigation actions, and closure status. Regulator-ready from the moment they're generated.

Report Types

Two Reports. Complete Compliance Documentation.

DPIA Suite produces two distinct enterprise-grade report types that together give regulators, DPOs, and auditors everything they need — without any manual compilation or formatting.

DPIA Assessment Report

Full assessment record: project metadata, every questionnaire answer with DPO review status and remarks, flagged items, uploaded documents, screening outcome, and final DPO approval signature.

Risk Register Report

Complete export of all identified risks: titles, categories, likelihood/impact scores, priority, assigned department, responsible person, mitigation strategy, residual risk score, status, and closure date — per assessment.

AI & Rule Engine Contribution Log

Documents which risks were identified via AI, rule engine, or manual flagging — demonstrating a systematic, defensible approach to risk identification for regulatory review.

Mitigation Effectiveness Summary

Original vs. residual risk scores per entry, all mitigation actions, approval timestamps, and responsible parties — evidence of risk treatment and ongoing compliance posture.

📋 DPIA Assessment ReportAPPROVED
Assessment Summary
Assessment NameCustomer Analytics Platform v2
DPO Approved✓ 14 Nov 2024
ROPA ReferenceROPA-2024-017
Sections Completed7 of 7
Answers Reviewed42 Approved · 3 Rejected
Risk Breakdown
Critical
2
High
4
Medium
5
Low
3
⚠️ Risk Register Report14 RISKS
Identification Source
🤖 AI Analyzer6 risks
📚 Rule Engine5 risks
🔴 Manual Flag3 risks
Closure Status
Closed9 risks (64%)
In Mitigation3 risks
Pending Review2 risks
Residual Risk
Avg. Original Score7.2 / 9
Avg. Residual Score2.8 / 9
FAQ

Frequently Asked Questions

Everything you need to know about DPIA Suite

No — DPIA Suite empowers your DPO, not substitutes for one. Under GDPR, responsibility for conducting and approving a DPIA remains with your organization. DPIA Suite gives your DPO a structured, auditable platform to manage the entire process efficiently — reducing manual effort, improving consistency, and producing defensible documentation. The DPO remains the accountable decision-maker throughout.

When a processing activity in your ROPA is flagged as high-risk — based on criteria such as systematic profiling, large-scale processing of sensitive data, or biometric processing — DPIA Suite automatically initiates a DPIA assessment for that activity. Metadata from the ROPA entry (processing purpose, data categories, recipients, retention periods) is pre-populated into the DPIA questionnaire, eliminating double entry. The completed DPIA is then linked back to the ROPA record, keeping your Article 30 register fully up to date.

The Rule Engine operates on deterministic logic — specific answer patterns trigger pre-configured risk entries automatically and consistently. It requires no inference and is ideal for well-known GDPR compliance gaps. The AI Analyzer reads the semantic content of free-text questionnaire answers and generates contextual, nuanced risk entries tailored to the specific processing described. Both modes output structured risk entries into the same register and can run simultaneously on the same assessment — they are complementary and designed to be used together for comprehensive coverage.

Yes. DPIA Suite supports full questionnaire template management. Compliance Admins can create custom categories, add or modify questions (with question type and guidance hints), and define which categories appear in screening vs. full DPIA flows. Organisation-specific templates can be built to reflect your industry, data processing landscape, and internal compliance standards.

Yes. DPIA Suite is designed and operated in full compliance with GDPR. We act as a Data Processor for personal data entered into the platform, governed by a Data Processing Agreement available to all customers. Data is stored in EU-based infrastructure, encrypted at rest and in transit, with strict access controls, full audit logging, and regular security assessments.

Get Started Today

Start Your First DPIA in Minutes

Join 150+ privacy teams using DPIA Suite to achieve Article 35 compliance with confidence and full auditability.